IEC 61511 Functional Safety Compliance Made Simple
We enable efficient and cost effective creation of IEC 61511 compliance documentation (SIL Calc, SRS, C&E, Test Plans, SIF List).

Functional Safety Compliance
•IEC 61511 Compliance Made Simple
•Rapidly create SIL Calcs and SRS Datasheets from templates or existing SIFs/IPLs
•Revision control allows users to track data that has been edited, checked, approved and issued
•Provides central storage of all protection layer data across an enterprise
Expert System for SIS
•Save manhours and drive consistency on SIF/IPL designs
•Leverage our Expert System to rapidly create SIL Calcs, SRS, C&E, and Test Plans from templates or existing SIFs / IPLs
•Templatize an entire process unit
Advanced Reporting
•Over 170 canned reports
•Autogenerated SIF List / SIL Verification Report
•SIL Calc Status report provides pass/fail criteria based on target and achieved
•Four SRS Datasheet formats to pick from
•Bulk generation / printing of SIL Verification and SRS Datasheets
Templates and Libraries
•Leverage the Quick Start Library to reduce rollout cost
•Includes a robust failure rate library, 8 SIF Templates, 5 IPL templates, and 1 Unit Operation Template
•Quickly and efficiently begin executing work
Bulk Data Management
•Never pay to type data twice
•Easily bulk insert data from any 3rd party source
•Edit and manipulate multiple records at once
•Patented real world model streamlines SIS engineering
Unlimited Users
• Only pay for what you need
•Simple size based licensing allows you to grow as you go
•Mix and match only the modules you need
•Short duration based licensing available for capital projects
•Simultaneous users all working at once
Expert System: Success Story
Projects Details:
- Project has 6 large Natural Draft Heaters
- Each heater has 48 SIFs / IPLs / Interlocks
- Desire to create:
- For SIFs: SIL Calcs / SRS / C&Es / Test Plans
- For IPLs / Interlocks: Protection Layer Requirement Spec / C&Es / Test Plans
- Created Templates from 1st heater
- Bulk loaded SPI data for the remaining 5 heaters
- Created all deliverables in 24 hours
- Traditional work process > 960 man hours